kew2006's Kitchen

Kitchen finished just in time - Baby girl due in two weeks!



Contact: kew2006 (My Page)
Posted on Wed, Aug 9, 06
Link to kitchen photos: http://www.kodakgallery.com/I.jsp?c=ysff3zn.8w861q93&x=0&y=fco04y


Details:

We did a complete gut remodel of the kitchen and adjacent powder room, adding insulation, new electric, new plumbing, hydronic radiant floor heating which required a new boiler that we needed anyway, new drywall; basically, the works. We enlarged the window above the sink and moved the doorway to the hall that leads to the powder room and to the stairs down to our basement family room.

The original powder room was only 42"x48" and contained a toilet, sink, and radiator. We enlarged the bathroom to 7’x42" and turned the toilet to allow a more useful design. We were also able to remove the radiators freeing up more space.

Total project took 9 weeks with no major problems. There are some things I may have done differently, but overall I’m very pleased with the outcome.




Comments:

Post a Comment



<< Home

Powered by Blogger